top of page

Sewer Commission 1/9/2025

Jan 14

1 min read

0

6

0

(Episode Description is AI generated and may be errors in accuracy)



Join us as we unravel the complexities faced by the Board of Sewer Commissioners in their January 2025 meeting. From the successful sewer connection of an eight-unit condo to challenges like the integration of a larger grease trap for the revamped Gap restaurant, we explore how these projects redefine the town’s infrastructure. We also delve into the innovative, yet, costly solutions devised to address issues with the force main at the simulcast building, including a cutting-edge lining technique that could save the day without extensive excavation.



We also provide insights into future developments, such as the proposed parcel service garage on Paramount Drive, and detail the meticulous process of biennial billing preparations. With the urgency of generator installations at various pumping stations, listen to how the team tackles setbacks like gas meter upsizing. This episode promises a comprehensive view of the sewer operations, offering a front-row seat to the decision-making process and strategic planning that keep our community running smoothly.



https://www.buzzsprout.com/2395663/episodes/16438903



Comments

Share Your ThoughtsBe the first to write a comment.
bottom of page